Checklist for remote analysis shifts


Step 2/3

Please check the following parameters and values:




Checks on Adei:

Subsystem What to look for good (green)
or bad (red)
Comment if bad
High Voltage
(K65)
Are there any unexpected spikes in the K65 readback.
(more details can be found here)
High Voltage
(absolute tank potential)
Are there any unexpected spikes in the tank potential readback.
(more details can be found here)
Tritium throughput Is the tritium throughput stable to within < 1 sccm? If not, something is wrong.
Is there a long term trend visible?